Plant Performance/Improvement
< Back       

Reduce outage time and maintenance, increase electricity generated, and extend plant life.

Recent projects include:              

  1. Reactor vessel integrated head assembly structural evaluation for Calvert Cliffs Nuclear Power Plant
  2. Control rod drive mechanism (CRDM) re-qualifications due to power uprating program for ANGRA Nuclear Power Plant
  3. Pressurizer surge nozzle structural weld overlay stress analysis for nuclear power plants
  4. Pressurizer spray nozzle structural weld overlay stress analysis for nuclear power plants
  5. Pressurizer safety and relief nozzle structural weld overlay stress analysis for nuclear power plants
  6. Instrumentation and valve bypass piping analyses due to flow-induced vibrations from reactor coolant pump shaft for nuclear power plants
  7. Reactor pressure vessel (RPV) in-core instrumentation component (ICI) analyses for nuclear power plant units
  8. Reactor vessel closure head stud tensioning re-qualification due to increased preload/elongation for Palo Verde Nuclear Station units
  9. Reactor pressure vessel ASME Section III analysis for new generation power plants, including closure flange, RPV head penetrations, core support block, in-core instrumentation and upper and lower shell regions
  10. Fatigue crack growth evaluations for pressurizer surge, spray and safety and relief nozzles
  11. Reactor pressure vessel head lift lug stress analysis
  12. Pressurizer surge and safety and relief nozzle structural weld overly design
  13. Field implementation drawings for structural weld overlay, including engineering design, welding and inspection requirements

Uploads/Plant Engineering Projects2.pdf

 