Reduce outage time and maintenance, increase electricity generated, and extend plant life.
Recent projects include: 
- Reactor vessel integrated head assembly structural evaluation for Calvert Cliffs Nuclear Power Plant
- Control rod drive mechanism (CRDM) re-qualifications due to power uprating program for ANGRA Nuclear Power Plant
- Pressurizer surge nozzle structural weld overlay stress analysis for nuclear power plants
- Pressurizer spray nozzle structural weld overlay stress analysis for nuclear power plants
- Pressurizer safety and relief nozzle structural weld overlay stress analysis for nuclear power plants
- Instrumentation and valve bypass piping analyses due to flow-induced vibrations from reactor coolant pump shaft for nuclear power plants
- Reactor pressure vessel (RPV) in-core instrumentation component (ICI) analyses for nuclear power plant units
- Reactor vessel closure head stud tensioning re-qualification due to increased preload/elongation for Palo Verde Nuclear Station units
- Reactor pressure vessel ASME Section III analysis for new generation power plants, including closure flange, RPV head penetrations, core support block, in-core instrumentation and upper and lower shell regions
- Fatigue crack growth evaluations for pressurizer surge, spray and safety and relief nozzles
- Reactor pressure vessel head lift lug stress analysis
- Pressurizer surge and safety and relief nozzle structural weld overly design
- Field implementation drawings for structural weld overlay, including engineering design, welding and inspection requirements
Uploads/Plant Engineering Projects2.pdf
|