NuVision Engineering, Inc. has provided radiological decontamination services to commercial nuclear and government facilities around the world for more than a decade.
                                                                                                                       
Originally developed and implemented in the early 1990s, our decontamination system is a unique, virtually dust-free way to efficiently clean many types of surfaces including steel and concrete.
                                                                          

We have successfully implemented the process in a number of areas, including:
  • Pipe-end decontamination for steam generator replacement projects
  • Equipment, structural steel and concrete decontamination
  • Radiological decontamination of pipe sectional nozzles prior to weld repair

Benefits of our decontamination system include:                         
  • Little, if any, dust is generated during the blasting process, reducing the potential for airborne contamination
  • Lightweight, portable equipment
  • Equipment can be automated to reduce man-rem exposure
  • Wide selection of abrasive blast medias to accommodate a variety of surface cleaning needs
  • Rapid surface decontamination with minimal change to the surface profile
  • Media can be recycled up to 5 times and may possibly be incinerated, further reducing waste
  • Soft media can be compacted up to 6 to 1 ratio
  • Dry blasting - no liquid waste to clean up
  • High decontamination factors are achieved with a single blasting pass
Experience and Customers                                                                   
 
The following is a summary of customers and plant sites that have used our decontamination services:
  • V. C. Summer
  • North Anna Unit 2
  • R. E. Ginna
  • D. C. Cook Unit 2
  • Byron Units 1 & 2
  • Braidwood Units 1 & 2
  • Farley Units 1 & 2
  • South Texas Project Units 1 & 2
  • Arkansas Nuclear One Unit 2
  • KORI
  • Almaraz Units 1 & 2
  • Tihange Units 2 & 3
  • Sequoyah Unit 1
  • Point Beach Unit 2
  • Palo Verde Units 1, 2 and 3
  • Beaver Valley Unit 1
  • Comanche Peak Unit 1
  • Watts Bar
  • Ft. Calhoun
  • Kewaunee
  • Ignalina (decon system design, build and supply contract)
  • Tomari Unit 1 (hot leg elbow replacement service contract)
US Department of Energy
  • Savannah River
    • Canister decontamination
    • I.D. pipe blast demo
    • Tool decontamination
    • Lead brick decontamination
  • Fernald
    • Tool decontamination
    • Structural shapes decontamination

Internal reactor vessel nozzle decontamination prior to weld repair:         
  • Ringhals Units 3 & 4. The above photo shows the view into the Ringhals reactor vessel.
Successful Projects